Skip to main content
tsa architects rending of exterior new office

2017 Newsletter: Edition Two

Project Updates

TSA Architects is assisting University Hospital with the remodel of two catheterization labs that will keep the state’s flagship academic hospital at the forefront of Cath Lab imaging technology. Cath Lab 2 will house a new Philips Allura FD20 Catalyst imaging system. Cath Lab 3 will be enlarged to provide more procedure space, and see a replacement of the Siemens equipment with a new Artis Q imaging system. Anesthesia, light and equipment ceiling booms by Skytron are being added to improve safety and efficiency by bringing power, data and medical gas lines overhead directly to the patient. Both lab’s control rooms will be remodeled to support the new equipment and staff work process. The entire Lab 2 & 3 suite will be updated to the current hospital standard for interior finishes. Construction work will begin in early June and should be complete by November.

Design Team

Project Manager and Architect: Doug Banks
Interior Design and Project Support: Stephanie Kwok
Project Support: Frederick Berte


VAMC North Campus Transformation

We’re excited to announce that construction has commenced on Phase 2 of the North Campus Transformation at Salt Lake City’s George C Whalen VA Medical Center.  This Rehabilitation & Prosthetics Expansion-visible along Foothill Blvd-will provide significant Inpatient Physical & Occupational Therapy and Exam areas, as well as easily-accessible Outpatient Prosthetic & Mobility Support to improve care for our wounded veterans.  It will also create a new, two-level East entry to the Hospital that embraces views to the Wasatch Mountains.  We are thrilled to team with the VA Healthcare System in designing facilities that better enable their mission.

Design Team

PIC:  Tracy Stocking
Design Principal:  Nathan Murray
Interior Designer:  Stephanie Kwok
Project Coordinator:  Blake Fredrickson
Project Manager:  Doug Banks


BUSINESS SERVICES BUILDING PLAZA REMODEL

The Business Services Building is a 5-story office building with 2 levels of underground parking. This parking garage has a larger footprint than the building and approximately 27,000 sf of plaza covers the balance of the garage. The plaza consists of a suspended structural slab with topping slab and various planters and landscaping and is terraced into 2 levels. Our exploratory observations revealed that there is no waterproofing system between the plaza deck and the structural slab. This appears to be the cause of most of the leakage.

The primary driver is to remove the existing plaza deck, install a rubberized asphalt waterproofing system and a new plaza deck with landscape features. The financial driver of the project provided an exciting opportunity to improve the aesthetics and functionality of the plaza. Creative design charrettes were held with the representatives of all the departments housed in the building, over two months, culminating in an optimized plaza redesign. The project includes replacement and upgrading the plaza landscape, creating a campus shuttle stop at to serve hospital patients and other building staff and visitors, and creating various shaded gathering and multi-function outdoor spaces for the 500 building occupants, including natural and artificial shade, convenience power, a gas grill, and myriad seating and gathering configurations.

Architectural renovation of the plaza for the purpose of making it more engaging, functional and inviting will include the hardscape portions of the plaza such as the plaza deck, retaining and planter walls, stairs, and railings. Landscape improvements to the plaza will support the architectural goals stated above with new planting beds, trees, and lighting. The landscaping at the perimeter of the plaza will replace the existing sod with new xeriscape plantings. All new landscaping will be drought tolerant, and upgrade the scheme to Salt Lake City and University standards.

Design Team

PIC:  Tracy Stocking
PIC: Tracy Stocking
Design Principal: Nathan Murray
Project Manager: John Meredith
Project Designer: Frederik Berte
Landscape Architect: Richard Gilbert (ArcSitio Design)



Staff News

TSA Architects is excited to announce the promotion of Douglas Banks, AIA to Principal Architect, and Board Member. A recognized expert in healthcare architecture, over his 25-year career, he has assisted many healthcare facilities with the design of highly complex spaces such as operating suites, imaging centers, and cardiac Cath labs. Doug earned his Master of Architecture degree from the University of Utah and has spent his career providing architectural healthcare services throughout the intermountain region. His natural ability to coordinate the complexities of leading edge medical technology in critical care settings has earned the trust and respect of major health care systems. He brings with him a collaborative philosophy and focuses on sophisticated healthcare clients to improve their mission-driven operations.
Doug’s clients include: University of Utah Health, Intermountain Healthcare, HCA/MountainStar, Iasis Healthcare, VA Medical Center and many other healthcare systems in the western United States. Recent notable projects include Hybrid Operating Rooms for Intermountain Healthcare at McKay Dee Hospital and Intermountain Medical Center.

Doug Banks can be reached at: dbanks@tsa-usa.com & (801) 463-7108


We are pleased to announce the addition of Rebecca Weidler to our team as our new Healthcare Planner. Rebecca is a recent transplant from Philadelphia with a decade of experience in architecture for health. Originally from Long Island, New York, she obtained her Master of Architecture from the Pratt Institute and her Bachelor of Arts from Southern Virginia University. She will be overseeing planning for the new Brigham City Hospital OR Expansion, and joining the University Hospital Infill Project team. Outside of work, she enjoys all kinds of creative pursuits including fashion design, drawing, sewing, and experimenting in the kitchen.


NEW OFFICE UPDATE

A sneak-peek of the inner workings of our new office! We’re looking forward to increased work space, easily-accessible sample storage, and expanded conference areas – as well as easy parking.


Our Experts Share

Dark, cold rooms and a boring fish tank vs. bright and cheery design and fresh baked cookies? We think the winner is obvious.

CLICK TO READ

2017 Newsletter: Edition One

 

Project Updates

University Healthcare – Center of Excellence for Orthopaedic Rehabilitation

We have been privileged to partner with University Hospital in several projects focused on enhancing their healthcare system including the New Center of Excellence for Orthopaedic Rehabilitation.

 

1.  The Design for the New Center of Excellence for Orthopaedic Rehabilitation:

  • A Holistic Center integrating Education and Physical Therapy in an open central core easily accessible from patient rooms
  • Empower and encourage patients to ambulate from the bed to all rehab amenities
  • Nurse and Provider Support Cores that reduce staff travel and maximize time with patients
  • Enhanced Personal Protection provisions optimize staff readiness for any medical event
  • 41 patient rooms

 

2.  This Design for the New Patient Room of the Future to be implemented across the hospital campus:

 

  • A Universal Room Design that embraces a hospitality environment maximizes patient empowerment and ambulation-enabling a return to a healthy life sooner.
  • An accessible room with compact charting and patient monitoring systems that do not obstruct patient access to restrooms
  • Enhanced accommodation of patient visitors
  • Integrates systems for effective in-room Telemedicine and other technologies

Completed Project: Prime Insurance Company Addition + Remodel

When Prime Insurance Company approached us with this project, we saw a unique opportunity to express their bold business model with bold, forward-thinking design. Their new addition, though fully connected to the main building, seemingly soars outwards akin to an aircraft taking flight (a nod to CEO Rick Lindsey’s affinity for aircraft) and showcases the uniqueness of their intrepid contribution to the industry’s specialty niche. The contemporary addition compliments the existing, regimented brick building, and both wings meld at the entrance where brick facade meets exposed metal beams and glass sheeting overhead. Windows utilizing low-lead glass serve two purposes: one, light is drawn in from the exterior to create a more positive and uplifting environment and two, the very “heartbeat” of their business – their staff hard at work – is projected to the outside world like never before. Open production areas strategically arranged with Herman Miller work pods encourage department interactivity.
Highlights of the project include:
  • Two-level addition housing private and executive offices
  • Flexible conference center
  • Dynamic reception hub
  • Fully-functional kitchen featuring stainless steel appliances, upscale seating and sound system
  • Gym stocked with state-of-the-art equipment and all-new shower and locker facilities
Main Floor Reception Hub

 

Kitchen and Dining Hall

 

Conference Suite

When asked her thoughts on how the new space reflected their brand, Director and Senior Vice President Barbara Malkowski had this to say: “We’re the masters of unique risk, we’re the contrarians.. we’re not your father’s insurance company, I hate to be so trite but we’re not. Our new approach, our fresh approach, our sleek approach, I would say it definitely plays to that.”

 


Staff News

This past January marks Nathan’s 5th anniversary of joining TSA Architects as partner and design principal. Nathan is respected for his passionate dedication and architecture, specializing in design for healthcare, senior care, and other mission-driven work. His passion for healthcare design was sparked as a patient in an operating room 20 years ago, and since that time he continually strives to create beautiful architecture and spaces that inspire not only health and healing but better the built environment we live in.

 

 

 

 

 

 


 

Our Experts Share

How significant of a role does lighting play in the patient experience?

Answer: Very. John Meredith shares how lighting can make or break recovery.

CLICK TO READ